The popular fishing spot, Pacifica Pier, has been closed since June due to observed cracking, separation, and displacement in the concrete. These structural issues led to a portion of the pier collapsing into the ocean during massive king tides affecting Northern California.
An enormous wave removed part of the L-shaped Pacifica Pier in the Bay Area on Wednesday. The incident, caught on video by local NBC Bay Area, happened shortly after 11 a.m. local time on November 25. Thankfully, nobody was present, as the pier had been closed since June. A City of Pacifica press release stated the closure was due to observed structural damage.
The extreme surf battering Northern California could not be withstood by the weakened pier. Waves and high tides have flooded Pacifica, leading to road closures and dangerous conditions for residents. The area faces a high surf and coastal flood warning from the National Weather Service. Officials advise the public to stay away from the water and waterside infrastructure.
“Fueling much of the flooding are king tides,” says the Associated Press. These tides are non-scientific terminologies describing the highest seasonal tides of the year.
Historically, king tides occurred once or twice annually, but rising sea levels due to climate change have increased their frequency in some areas. They result from the gravitational pull when the sun, moon, and Earth are nearly aligned, producing significant tidal effects.
The City of Pacifica has not yet responded publicly to the collapse. PEOPLE has reached out for comments. The Rev. Herschel Harkins Memorial Pier, known as Pacifica Municipal Pier, was constructed in 1973. It measured 1,140 feet long and has experienced multiple closures for repairs over the last decade. The region recognizes it as one of the best fishing piers due to the variety and quality of fish caught there.
Pacifica last closed the pier on June 4 due to observed cracking, separation, and concrete displacement. On November 13, the city reported a contract with the Dutra Group for replacing 300 boulders moved to the pier’s abutment to prevent further damage. Mobilization started earlier in the week, with completion initially scheduled for early December.

Leave a Reply